Home | Feasibility Report
Feasibility Report - Appendix D - Engineering
Habitat Restoration Preliminary Design
Phase 2 Stage 2 of the Hydrology and Geomorphology
Assessment in Support of the Feasibility Study
Report Text (318 k)
Appendices
Figures
- Figure 1: Project Area and Surrounding Areas Managed by CDFG
- Figure 2: Historic Marsh Outline (1856)
- Figure 3: Initial Elevation and Years to Vegetation Establishment
- Figure 4: Pond Bathymetry
- Figure 5: Existing Conditions
- Figure 6: Habitat Restoration Option 1: Habitat Goals
- Figure 7: Habitat Restoration Option 2: Habitat Goals
- Figure 8: Habitat Restoration Option 3: Habitat Goals
- Figure 9: Habitat Restoration Option 4: Habitat Goals
- Figure 10: Habitat Restoration Option 1: Mix of Tidal Marsh and Ponds
- Figure 11: Habitat Restoration Option 2: Tidal Marsh Emphasis
- Figure 12: Habitat Restoration Option 3: Pond Emphasis
- Figure 13: Habitat Restoration Option 4: Accelerated Restoration
- Figure 14: Schematic of Starter Channel and Berm
- Figure 15: Habitat Areas, Options 1 and 2
- Figure 16: Habitat Areas, Options 3 and 4
- Figure 17: Habitat Evolution by Option
- Figure 18: Habitat Restoration Option 1, Habitat at Year 5
- Figure 19: Habitat Restoration Option 1, Habitat at Year 50
- Figure 20: Habitat Restoration Option 1, Generalized Long-term Habitat
- Figure 21: Schematic of Marsh Evolution
- Figure 22: Evolution of Site Elevations and Habitats Over Time
Back to top
|